How DT Solution Supplied the P6 Schedule-Management Standard to Kunhwa

Engineering & construction (E&C) projects are hard to schedule because design, procurement and construction interlock over long timelines. DT Solution supplied the standard schedule-management tool, Oracle Primavera P6, to Kunhwa — laying the foundation for data-driven schedule management.
The Challenge — Standardizing Complex Engineering Schedules
Engineering projects chain countless activities in sequence, so without a standard scheduling tool it's hard to gauge how one task's delay ripples to the overall deadline. When schedules are scattered by department and individual, there's no single view of the whole project at all.
What We Did — Supplying P6
DT Solution supplied Oracle Primavera P6 licenses to Kunhwa, laying the foundation for a standard scheduling environment that manages schedule, resources and actuals in one model on a critical-path (CPM) basis.
What the adoption enables
- A standard schedule-management tool (P6) in an engineering setting
- A basis to analyze task dependencies and delay impact on a critical-path (CPM) basis
- An environment to manage schedule and resources consistently in one model
※ The scope of this case is license supply. Actual results are determined in the field adoption and operation that follow.
What It Means
Adopting a standard scheduling tool is the starting point of data-driven schedule management. Once the tool is in place, the next thing that matters is embedding it so the field links plan and actuals.