INSIGHTS & NEWS
From the latest Primavera·Unifier news to DTSolution's wins and insights — all in one place.

Install the system and it still fails if the codes don't line up — the metrics turn into fiction. Why master-code (WBS·CBS·RBS) standardization is the foundation of PMIS and EVM, and what bad code structures cost.

Primavera Unifier is Oracle's PPM solution that controls a capital project's cost, contracts, changes and processes on one platform — while work is in progress. Following a single change on site, we unpack what Unifier does and how it differs from P6.

The global construction-management software market is about $11.6B in 2026, growing 9–10% a year to $24.7B by 2034 (Fortune·Mordor). Construction is 13% of global GDP yet the second-least digitized industry — and that gap is the opportunity.

If you're 80% complete but the budget is already spent, the project is already in the red. EVMS (Earned Value Management) ties cost and schedule into one metric, so the loss shows up at the 20% mark — not at the end.

Large EPC projects run ~79% over budget and ~52% late on average (McKinsey). A PMIS that shaves even a few points off that overrun returns many times its cost. We lay out a 4-stage roadmap by scale and maturity, work through the ROI, and name the most common failure causes.

Big Tech's 2026 capex hits $725B (+77%). Capital is abundant, but large transformers now take four years and power and sites are constrained. Korea's 3GW mega data center is still pre-construction. The real bottleneck of the AI boom is construction.

Bidding, contracts, cost, quality, materials, safety, drawings and productivity in one PMIS. How DT Solution built an enterprise project-management system for Samsung Heavy Industries High-Tech (Samsung Electronics' Pyeongtaek semiconductor plant) across two phases.

To standardize schedule management on the shipyard floor, DT Solution supplied Oracle Primavera P6 and — through foundational and advanced training — helped the field operate it themselves.

McKinsey estimates AI and automation can cut construction costs by up to 20% and schedules by 30%. The market is heading for $35.5B by 2034 (24.8% CAGR). Yet only 27% of firms have adopted AI and just 5.5% see real financial impact — what decides the outcome isn't the tool, it's data and process.

To standardize schedule management on engineering projects where design, procurement and construction are long and intertwined, DT Solution supplied Oracle Primavera P6 to Kunhwa.

In 2024, construction led Korea's workplace fatalities at 328 deaths (39.7%), with falls the No. 1 cause. We compare Korea, the US and Japan, and lay out — with independent evidence — how much computer-vision safety AI really cuts accidents.

DT Solution supplied Oracle Primavera P6 licenses to Kunhwa.